It is applied on interiors of all building’s ceilings.
Indoors:
• Cement based plasters,
• Exposed Concrete surfaces,
• Plasterwork or drywall surfaces,
• Old painted surfaces.
• • Surface should be clean, dry, proper and stable.
• Fenix Super Ceiling should be mixed with %30 water. It should be applied with roll after stirred properly for 1. and 2. Layers
• Fenix Super Ceiling should be applied as 2 layers with a lambskin roller or brush. Time should be waited between layers at least 2 hours.
• Drying up duration is between 6 – 24 hours.
• Environment temperature: between +5 °C and +30 °C
•It should not be applied under hot or moist weather conditions