Interior and exterior of all buildings; especially in wet areas such as balcony, bathroom, WC and kitchen. It is applied underneath the ceramic.
It is used as an insulation material on
exterior, underneath the paint and coatings.
Cement based screeds, plasters,
Exposed concrete,
Contact us for other different surfaces.
Not applicable on wooden, chipboard plywood and metal surfaces.
Not applicable against negative water pressure.
Not applicable on terraces and drinking water tanks.
It should not be left bare under direct sunlight.
Appliable layer number: 2-3 layer.
Duration of mortar’s usability: 2 hours max.
Time to wait between layers: apprx. 6 hours.
Time to wait for applying ceramic over: 1-2 days.
Full drying time: 48 hours
Duration of gaining mechanic strength: 3 days.
Duration of becoming water impermeable: 7 days.
Surface needs to be dry, clean, and durable.
Surface defects needs to be fixed with Fenix Repairing Mortar 24 hours before
Izodek Two Compound Half Elastic Sliding Isolation” application.
Multi porous surfaces such as exposed concrete and cement based plaster should be
wetted and waited until the water layer is gone so that the surface remains moist.
20 kg’s of dust compound should be mixed with 5 kg’s of liquid compound. It should
be mixed with a low-speed mixer for 2-3 minutes
until it gets homogeneous.
Mixture should be mixed again after resting for 2 minutes.
Izodek Two Compound Fully Elastic Sliding Isolation should be applied to the surface
for double layers with brush or a trowel. Every layer should be made vertically to
another.
6 hours should be waited minimum between layers.
Identified durations are valid in 20 °C floor or environment temperatures, in low
temperatures duration will be longer, in high temperatures duration will be shorter.
Dekan Boya ve Yapı Kimyasalları San.Tic.Ltd.Şti. is not responsible for application
errors that may occur if the product is used for purposes other than its intended use or
if the application conditions and recommendations mentioned above are not followed.
• Environment temperature: between +5 °C and +30 °C.
• It should not be applied under hot or moist weather conditions.
• It should not be applied to surfaces that under frost hazard within 24 hours, frozen and
melting.
Water should not be added for the mixture, only applicable with its own liquid.
Foreign materials should not be added.
Surfaces with “Izodek Two Component Half Elastic Sliding Insulation” should be protected
from direct sunlight, air currents and frost for 3 days.
Surface should be soaked if necessary.
MCeramic protective layer should be applied over “Izodek Two Component Half Elastic Sliding
Insulation” to prevent mechanic impacts.
Ceramic etc. coating applications should not be applied if before 3 days of “Izodek Two
Component Half Elastic Sliding Insulation” application.
Used tools should be washed with water before drying up.