Indoor and outdoor walls;
•Gas Concrete, Concrete, Exposed concrete, pumice, briquette wall and ceiling plasterwork
• Equal thickness should be applied to the surfaces with a steel trowel.
• Application thickness should be between 2 mm – 7mm.
• Surface smoothing should be done with smoothing trowel and needs to be ready for coloring or another coating material.
• Surface needs to be cleaned of materials that are anti-adhesive such as dust and oil. Surface needs to be dry, clean, and durable.
• Application surface should be moisturized if necessary.
• Surface defects that are deeper than 1cm needs to be fixed with Fenix Repairing Mortar 6-8 hours before application.
• After surface cleaning, it should be primed with Fenix Gross Concrete Primer as a single layer in order to increase the adhesion strength and balance the surface absorbency and leave to dry for 1-2 hours.
• Before starting the application on gas concrete surfaces, the surface should be primed with Fenix Isolated Lacquer 1/7 Primer for decreasing water absorption.
• Before starting the application on exposed concrete surfaces, the surface should be primed with Fenix Exposed Concrete Primer as a single layer and left to dry for a minimum of 3 hours.
• While applying environment and surface temperature must be between +5 °C and +30 °C.
• Plaster should be humidified periodically for 7 days long after application for increasing the strength of plaster.
• For better results and high efficiency, plaster sections can be used in corners.
• Plaster should not be used on surfaces.
• It can be used Fenix Binder 100 Latex for better results and high efficiency.
• Product should be used in its pot life after its mixed. While application, products that are out of its pot life should not be used.
• It should not be added foreign matters in prepared mortar like lime, cement, and plasterwork.
• It should not be added extra water to admixture.
• It should not be applied to unstable surfaces. Stability and bearing of old surfaces should be checked before application.
• While applying, surface must kept air tight and any water contact must be avoided.
• It should not be applied to surfaces that under frost hazard within 24 hours, frozen and melting
• In hot weather conditions, materials should not be kept under direct sunlight and admixture should be made with cold water.
• It should not be applied in strong winds or areas that under direct sunlight, if application must start under these circumstances, first environment and surface should be prepared.
• It should not be applied under rainy weather, application surface must kept safe from rain for 24 hours.
It should be mixed with 10 liters of clean water to its 50kg package. Fenix Ready-Made Rough Hand Plaster
should be mixed thoroughly, preferably with a low-speed mixer or trowel so that there are no lumps.
Mortar should be rested
for 15 minutes before usage.Fenix Ready-Made Rough Plaster should be applied to surface equally with a steel trowel.
First layer should not be thinner than
1 mm. It should be waited for 3-6 hours if application requires multi-layers.
Total thickness should not be over than 3 mm. Surface smoothing should be
done with smoothing trowel and needs to be ready for coloring or another coating material
It should be moisturized for 2-3 days after application.
Identified durations are valid in 20 °C floor or
environment temperatures, in low temperatures duration will be longer, in high temperatures duration will be shorter.
Mix Proportion
It should be mixed with 23-25% water by weight.
Mixing Equipment
* Low-speed mixer
* Special tip mixing equipment
Mixing Duration
It should be mixed with a low-speed mixer so that there are no lumps. After resting 3-4 minutes it should be mixed again for 1-2 minutes before usage.