It is applied on interiors of all buildings as decorative purpose.
Indoors:
• Cement based plasters,
• Exposed Concrete surfaces,
• Plasterwork, gypsum block or drywall surfaces,
• Old painted surfaces,
• Gas concrete,
• Contact us for other application surfaces.
• Drying up duration is between 6 – 12 hours.
• Surface should be clean, dry, proper and stable.
• Environment temperature: between +5 °C and +30 °C
• It should not be applied under hot or moist weather conditions.
• Dekan Plastic should be mixed with %30 water. It should be applied with a brush or roller after stirred properly for 1. and 2. Layers
• Dekan Plastic should be applied as 2 layers with a roller or brush.
Time should be waited between layers at least 2 hours.